What is Kanban?
Kanban is a method for managing work in which all tasks are made visible on a board and tracked in columns such as “To do,” “In progress” and “Done.” A limit on simultaneous work (WIP limit) prevents overload and exposes bottlenecks.

Kanban: definition and origin
Kanban (Japanese for “signal card”) comes from Toyota’s manufacturing, where cards controlled the replenishment of material. For knowledge work, the method was adapted in the 2000s and is now widespread in software development, IT support, marketing and administration. Its core: make work visible and manage the flow.
A Kanban board shows each task as a card that moves from left to right through columns, for example “Backlog,” “In progress,” “Review” and “Done.” At a glance, everyone sees who is working on what, what comes next and where tasks are piling up.
The principles in daily work
The key element is the WIP limit (work in progress): only a few cards are allowed per column at the same time. Once the limit is reached, work is finished first before anything new begins. This avoids multitasking, shortens lead time and makes bottlenecks visible instead of hiding them behind a long list of started tasks.
The flow is measured, for example by lead time (how long a card takes from start to finish) and throughput (how many cards are finished per week). Unlike Scrum, Kanban has no fixed sprints and no prescribed roles and can therefore be introduced into existing workflows.
- Map the current process as columns
- Capture all ongoing tasks as cards
- Set WIP limits and stick to them consistently
- Define “done” clearly for each column
- Review lead time regularly and remove bottlenecks
Real-world example: a maintenance team for websites and stores
A small maintenance team looks after websites and online stores for several clients. Every day brings error reports, text changes and update requests that cannot be planned in sprints. The team keeps a board with the columns “New,” “In progress,” “Waiting for client,” “Test” and “Done.”
The WIP limit of three tasks per person quickly shows that many cards pile up in “Waiting for client.” The team now clears questions in a batch in the morning, lead time drops, and urgent incidents run through a separate express lane without blocking the rest of the flow.
Benefits, limits and getting started
Kanban is easy to understand, flexible and creates transparency without a major changeover. Limits: without time boxes, there is no rhythm pushing teams toward regular results and retrospectives, and a board alone does not replace prioritization. Typical mistakes are WIP limits that nobody observes, columns without clear criteria and cards that sit for weeks.
Nano Concepts advises on choosing the right way of working—Kanban for ongoing maintenance and support, Scrum elements for time-limited development projects—and sets up boards and ticket systems for your team. Especially in mid-sized companies, where there is often no dedicated project office, getting started with a simple board takes only a few days.
Frequently asked questions about Kanban
Scrum works in fixed time periods, the sprints, with defined roles and meetings. Kanban has no fixed cycles: tasks flow continuously through the board, limited by WIP limits. Kanban suits ongoing work, Scrum suits projects with plannable stages.
WIP stands for “work in progress,” that is, started work. The limit sets how many tasks may be worked on at the same time. That way, work is finished before anything new starts, and jams show up early instead of quietly lengthening lead time.
No. A whiteboard with sticky notes is enough to start. Digital boards in ticket systems make sense when the team works in different places, needs reports or wants to give clients insight into the status of their requests.
Matching services

Software Development
Software from requirements to operations – web, mobile and integrations from a single source.
Learn more
Maintenance & Support
Updates, monitoring, backups and further development – so websites, apps and software run reliably.
Learn more
Technology Consulting
Software selection, architecture, code review and a digitalization roadmap – independent and implementation-oriented.
Learn more
IT Support
Helpdesk, level 1 to level 3 support and workplace services – remote and on site from a single source.
Learn moreRelated terms
Relevant for these industries
Related magazine articles

Prioritizing Technical Debt: Pay the Interest or Pay It Down?
Technical debt is not a synonym for bad code – it becomes dangerous when it stays invisible. Here is how to assess legacy burdens by impact and effort and reduce them in a plannable way.
Read more
Microservices or Monolith: A Decision Guide for Teams and Products
Microservices are seen as modern, yet for many products a modular monolith is the better choice. How to weigh teams, releases, data consistency and operating costs realistically.
Read more
Software Requirements Specification (Lastenheft): Structure, Example and Checklist
A good requirements specification makes quotes comparable and fixed prices possible. How it is structured, how to word requirements so they can be tested and how to tell that yours is complete.
Read more